Structural System
RCC framed structure designed for seismic compliance (Zone-III).
Masonry
Masonry AAC block masonry wall.
Pest Control
Anti-termite treatments wherever applicable during the construction stage.
Being integrated modern architecture with top-tier specifications,
DRA Clover balances elegance with eco-friendly designs.
RCC framed structure designed for seismic compliance (Zone-III).
Masonry AAC block masonry wall.
Anti-termite treatments wherever applicable during the construction stage.
600mm x 600mm vitrified tile flooring and skirting.
Vitrified tile flooring and skirting – (U).
600mm x 600mm vitrified tile flooring and skirting.
300mm x 300mm anti-skid ceramic tile flooring.
300mm x 300mm anti-skid ceramic tile flooring.
Two coats of acrylic emulsion over one coat primer and two coats of wall putty.
Putty Finish with acrylic emulsion paint.
Plaster finish with weather proof as decided by the architect.
300mm x 450mm Glazed ceramic wall tiles up to 7’-0” height.
Glazed ceramic wall tile 2’-0” above the kitchen counter.
Platform with granite counter slab 2’-0” wide.
Stainless steel single bowl sink with drain board and sink faucet of JAQUAR or equivalent..
Provision for chimney, water purifier& washing machine.
Wall-mounted European Water Closet (EWC) of JAQUARor equivalent will be provided with CONCEALED CISTERN – (U).
Health faucet, pillar cock, wall mixer, overhead shower of JAQUAR or equivalent.
SS square-designed gratings will be provided.
Grid-type false ceiling will be provided above 7’-0” height(easy maintenance of plumbing lines & geysers).
Pre-engineered veneer finish flush door with architrave, ironmongery like door lock, tower bolt, door viewer, magnetic catcher will be provided.
Pre-engineered laminate finish flush door with architrave, ironmongery like door lock, tower bolt, magnetic catcher will be provided.
Pre-engineered FRP moulded shutter doors with ironmongery like thumb turn lock and a latch will be provided.
UPVC sliding windows with necessary hardware will be provided.
UPVC frame and sliding door with see-through glass.
UPVC frame with glass louvered ventilation will be provided.
MS safety grills will be provided for all the sliding windows inside the apartment.
SS handrail with Toughened Glass as per architect design –(U).
Water proofing will be done the water retain area like lift pit, toilet, balcony UG sump, STP & OHT.
3 Phase connection for each apartment.
350 watts for 2BHK, 500 watts for 3BHK through Automatic Changeover Current & Limiter (ACCL). (Instead of pre-designed use of electrical light points during power cut flexibility to use the lighting circuit of choice within the allotted power capacity)– (U).
RCCB safety device will be provided for each apartment (protection against voltage fluctuations, earth fault as well as any leakage current)
Modular Switches and sockets will be of Anchor/ L & T or equivalent.
Fire Retardant Low Smoke (FRLS) copper wire of a quality ISI brand.
Provision for TV in living and master bedroom with pre-wired co-axial cable for easy DTH connectivity.
Provision for fiber optical cabling in living.
Split air-conditioner provision will be provided living/dining and all the bedrooms. Drain and copper pipe provision for A/C (Easy for fixing your air-conditioner without calling technicians to drill the walls).
Exhaust fan provision for all the toilets.
Geyser provision for all the toilets.
Hydro pneumatic Pressure System (Provides water at constant pressure in all apartments irrespective of the floor vis-à-vis traditional overhead tank) – (U).
All internal plumbing lines are CPVC.
All external plumbing lines are UPVC / PVC pipes.
All drainage plumbing lines are PVC pipes.
100% power back-up for common areas.
13-passenger stretcher lift & 8-passenger lift - KONE / FUJITEC or equivalent.
Tile or panel cladding will be provided.
Ground floor lobby finished with vitrified flooring with gypsum false ceiling. All the corridors will be finished with tile flooring with matching skirting. Painting will be two coats of acrylic emulsion over one coat primer.
Timer Based Control for all Non-Emergency Exterior and Common Area Lighting.
Anti- skid ceramic tile flooring and painting will two coats of acrylic emulsion over one coat primer.
MS handrail with enamel paint for all the floors.
Granolith cement flooring with car park numbering.
Solar reflective cool tile finishing satisfying IGBC.
Well-defined driveway with interlocking paver block laid all round the building, demarcation of driveway, convex mirror, driveway lighting, speed breakers for safe turning in driveway.
Centralized sewage treatment plant will be provided.
Adequate capacity of centralized water treatment plant will be provided based on water quality.
CCTV surveillance cameras will be provided at entry and exit, stilt lobby, driveway & All floors lift/staircase lobby.
Security cabin will be provided at the entrance.
Building perimeter fenced by the compound wall with grand entry gates for a height as per architect’s / landscape design.
Adequate landscape will be provided as per the landscaping consultant’s design.
Apartment owner's name board will be provided on the stilt floor.