Structural System
RCC framed structure designed for seismic compliance (Zone-III).
Masonry
AAC block masonry wall.
Pest Control
Anti-termite treatments wherever applicable during the construction stage.
Experience superior craftsmanship throughout our projects, emphasizing elegant finishes and modern
amenities to create a comfortable, inviting atmosphere for all residents.
RCC framed structure designed for seismic compliance (Zone-III).
AAC block masonry wall.
Anti-termite treatments wherever applicable during the construction stage.
800mm x 800mm vitrified tile flooring and skirting.
Wooden finish vitrified tile flooring and skirting.
600mm x 600mm vitrified tile flooring and skirting.
300mm x 300mm anti-skid ceramic tile flooring.
300mm x 300mm anti-skid ceramic tile flooring.
300mm x 300mm anti-skid ceramic tile flooring.
Two coats of acrylic emulsion over one coat primer and two coats of wall putty.
Two coats of acrylic emulsion over one coat primer and two coats of wall putty.
Plaster finish with weather proof texture paint or weather proof emulsion paint as decided by the architect.
300mm x 450mm Glazed ceramic wall tiles up to 7'-0" height.
Glazed ceramic wall tile up to 3’ 0”.
Bare Kitchen.
Provision for chimney, HOB & water purifier.
Provision for washing machine.
JAQUAR / AMERICAN STANDARD or equivalent will be provided.
Rimless wall mounted EWC for all the toilets. (The rimless toilet easier to keep clean, it will stay more hygienic after every flush. The direct flush technique used by most rimless toilets shoots water around the whole of the bowl, which cleans the pan much more effectively than a regular toilet) - (U).
JAQUAR / ROCA or equivalent will be provided. Single lever HI-FLOW concealed diverter for hot& cold mixer with overhead showerwill be provided in all the toilets.
SS square designed gratings will be provided.
Grid type false ceiling will be provided above 7'-0" height(easy maintenance of plumbing lines & geysers).
Hardwood wood frame with 40mm thick flush shutter both the side Teak Veneer finish with architrave. Door lock Dorma / Dorset or equivalent, Ironmongeries like tower bolts, door viewer, magnetic catcher in SS finish.
Pre-engineered laminate finish flush door with ironmongery like door lock, tower bolt, magnetic catcher in SS finish will be provided.
Pre-engineered laminate finish flush door with ironmongery like thumb turn lock and a latch will be provided.
UPVC sliding windows with bug mesh will be provided inside the apartments (except openable windows & bug mesh protects you from the menace of mosquitoes) - (U).
UPVC frame and sliding door with see through glass.
UPVC frame of fixed or adjustable louvered or openable shutter for ODU access.
MS safety grills will be provided all the sliding windows inside the apartment.
SS handrail will be provided as per architect design.
Water proofing will be done the water retain area like lift pit, toilet, balcony & utility / service area, UG sump & OHT.
3 Phase connection for each apartment.
800 watts throughAutomatic Changeover Current & Limiter (ACCL). (Instead ofpre-designed use of electrical light points during power cut flexibility to use the lighting circuit of choice within the allotted power capacity).
RCCB safety device will be provided for each apartment (protection against voltage fluctuations, earth fault as well as any leakage current).
Modular Switches and sockets will be of Panasonic / L & T or equivalent.
Fire Retardant Low Smoke (FRLS) copper wire of a quality ISI brand.
Provision for TV inliving and master bedroom with pre-wired co-axial cable for DTH easy connectivity.
Provision for fibre optical cabling in living & master bedroom.
Split air-conditioner provision will be provided living/dining and all the bedrooms. Pre - installed conduit provided as provision for A/C (Easy for fixing your air-conditioner without calling technicians to drill the walls).
Exhaust fan provision for all the toilet.
Geyser provision for all the toilets.
Water supply will be gravity system with booster pump.
All internal plumbing line are CPVC.
All external plumbing lines are UPVC / PVC pipes.
All drainage plumbing lines are PVC pipes.
100% power back-up for common areas.
6 passenger automatic lift (Fujitec / Kone / Equivalent ) will be provided.
Granite or panel cladding will be provided.
Ground floor lobby finished with granite flooring with gypsum false ceiling. All the corridors will be finished with tile flooring with matching skirting. Painting will be two coats of acrylic emulsion over one coat primer.
Granite / rustic tile flooring and painting will two coats of acrylic emulsion over one coat primer.
MS handrail with enamel paint for all the floors.
Granolith cement flooring with car park numbering and painting will be two coats of acrylic emulsion over one coat primer.
Weathering course with pressed clay tile finishing.
Well defined driveway with interlocking paver block.
UG sump with OHT.
Adequate rain water harvesting pit will be provided at site.
CCTV surveillance cameras will be provided at entry and exit, stilt lobby & driveway.
Security cabin will be provided at the entrance.
Building perimeter fenced by the compound wall with entry gates for a height as per architect / landscape design.
Adequate landscape will be provided as per the landscaping consultant.
Apartment owners name board will be provided in the stilt floor.